b'TEST SUMMARY Objective To determine the fire resistance of a nominally 100 mm thick DeltaCool-MW insulated panel wall assembly when tested in accordance with AS 1530.4:2014 Methods for fire tests on building materials, components and structures, Part 4: Fireresistance test for elements of construction. Test Sponsor Delta Panels Pty Ltd 2828 Ipswich Road Darra Brisbane, 4076AustraliaDescription of Test Specimen The test specimen consisted of a wall nominally 3,000 mm high x 3,000 mm wide, formed from three, 100 mm thick DeltaCool-MW panels. Two of the panels were full size, 3,000 mm tall by 1,200 mm wide, the width of the third panel was cut to 590 mm. The panels were installed within a concrete lined specimen holder and orientated such that the panel joints were vertical. The panels were fixed to the specimen holder on both horizontal edges and one vertical edge on both faces of the wall with 50 mm x 50 mm x 1.2 mm thick steel angle.Date of Test 12 September 2018 Test Results ThetestresultsinaccordancewithAS1530.4:2014,Methodsforfiretestsonbuilding materials,componentsandstructuresPart4:Fireresistancetestforelementsof construction was as follows:Integrity122 minutes No Failure Insulation72 minutes The tested specimen is deemed to have achieved an FRL of -/120/60 The test standard requires the following statements to be included: "The results of these fire tests may be used to directly assess fire hazard, but it should be recognized that a single test method will not provide a full assessment of fire hazard under all fire conditions. "This report details methods of construction, the test conditions and results obtained when the specific element of construction described herein was tested following the procedure outlined in this standard. Any significant variations with respect to size, constructional details, loads, stresses, edge or end conditions, other than those allowed under the field of direct application in the relevant test method, is not covered by this report. REPORT NUMBER:ISSUE DATE:PAGE:FR10430-001 ISSUE 21 June 20232 of 21 THE LEGAL VALIDITY OF THIS REPORT CAN ONLY BE CLAIMED ON PRESENTATION OF THE COMPLETE SIGNED PAPER REPORT.EXTRACTS OR ABRIDGMENTS OF THIS REPORT SHALL NOT BE PUBLISHED WITHOUT PERMISSION FROM BRANZ LTD.branz.nz | 1222 Moonshine Rd, RD1, Porirua 5381, Private Bag 50 908, Porirua 5240, New ZealandPhone +64 4237 1170branz@branz.co.nz'