b'8. HANDLING OF THE PANELSCrane and SlingA crane can be used to lift panels into their final fixing positionCare must be taken to correctly align the sling to the marked lifting points (as per attached tables)Set the packs onto the site in the proper orientation for the erection sequenceA spreader bar must be used to ensure that the load is evenly disturbedA spreader bar must be used to ensure that the lifting straps do not squeeze in on the panels causing any deformation to the panels edges and delamination of the skins.Protective blocks are to be used under the slings to ensure that the steel skins are not deformed or crushed during the lifting process.Packs over 1800 kgs and less than 10 meters may be lifted as shown in figurePacks over 1800 kgs and/or over 10 metres may be lifted as shown in figure Head Office: 731 Boundary Road, Richlands, Qld 4077 Page: 13 of 68Sydney Depot: 11 The Northern Road, Narellan, NSW. 2567 Version Date: 2024-05-30ABN: 11 147 861 292 P: +61 7 3271 2170 E: info@deltapanels.comW: www.deltapanels.com'