b'STEP 8 POST TO FOOTING SELECTIONTimber Post to Stirrup (see Figure A12)Tabulated Data is in kNFixing Details Footing DetailsNumber of BoltsUplift (kN) Depth of PadD=450mmD=600mmDepth of PadD=450mmD=600mm and Diameter d(mm) (kN) (kN) d(mm) (kN) (kN)2/M10 Bolts 6.75 600 2.25 3.99 1200 4.49 7.982/M12 Bolts 9.65 750 2.81 4.99 1500 5.61 9.982/M16 Bolts 16.7 900 3.37 5.99 1800 6.74 11.981000 3.74 6.65 2000 7.49 13.31Load Width - Post 1 = Half (0.5) of A metres + C metersLoad Width - Post 2 = Half (0.5) of A metres + D metersLoad Width - Post 1 = Half (0.5) of A metres + C metersLoad Width - Post 2 = Half (0.5) of A metres + Half (0.5) B metersLoad Width - Post 3 = Half (0.5) of B metres + D meters Figure A1242 ABN: 11 147 861 292E: info@deltapanels.com P: +61 7 3271 2170 W: www.deltapanels.com Version Date:43A: 731 Boundary Road, Richlands, Qld 4077Sydney Depot: 11 The Old Northern Road, Narellan, NSW 25672024-03-24'