b'Fire assessment report R1.0 Table of contents Quality management . 2Executive summary . 31.0 Introduction 52.0 Framework for the assessment . 52.1 Assessment approach . 52.2 Compliance with the National Construction Code . 62.3 Declaration 63.0 Requirements and limitations of this assessment . 74.0 Description of the specimen and variations 84.1 Description of assessed system 84.2 Referenced test data . 84.3 Variations to the tested system . 84.4 Test and assessment standard . 85.0 Schedule of component 96.0 AssessmentDeltaCool-MW and DeltaTrim-MW 116.1 Description of variation / background 116.2 Methodology 116.3 Tested system . 116.4 Variation in thickness 116.5 Variation in profile 116.6 Delta Trim-MW 126.7 Assessment outcome 127.0 Validity . 13Appendix A Panel profiles . 14A.1 DeltaCool . 14A.2 Delta Trim 16Appendix B Tested system . 17Appendix C Summary of supporting test data 21C.1 Test reportRTF252619 R1.0 . 21Page 4 of 21 Copyright 2025 Jensen Hughes, Inc.All Rights Reserved. T1124 PAC'