b'Fire Engineering Assessment, Revision 01 DeltaCool, DeltaSecrectFix, DeltaTrim at 100 mm and 75 mm Fire Performance, Project No. 25367 25367-SFE-FEA-01-Delta Panel Fire Performance APPENDIX BCOMPLIANCE WITH NCC REQUIREMENTS NCC Clause A2G1 defines that compliance with the Performance Requirements can only be satisfied by a: 1)Performance Solution; and/or 2)Deemed-to-Satisfy Solution; or 3)A combination of both 1. and 2. The combination of 1. and 2. is referred to as a Compliance Solution. Generally, the Performance Solutions contained in this document contain a combination of both a Performance Solution and DtS requirements.The buildings Performance Solution will utilise a combination of both 1. and 2. to achieve the relevant NCC Performance Requirements. The requirements and design outcomes (i.e. the Compliance Solution) of this document are provided to meet the relevant NCC Performance Requirements and are referred to in this document as Fire Engineering Systems which are listed in Section 1. B.1Performance Solution MethodologyThe following describes the mandatory process which must be followed when documenting a Performance Solution.NCC Clause A2G2 states: 1)A Performance Solution is achieved by demonstrating: kk.compliance with all relevant Performance Requirements; or ll.the solution is at least equivalent to the Deemed-to-Satisfy-Provisions. 2)A Performance Solution must be shown to comply with the relevant Performance Requirements through one or a combination of the following Assessment Methods: a.Evidence of suitability in accordance with Part A5 that shows the use of a material, product, plumbing and drainage product, form of construction or design meets the relevant Performance Requirements. b.A Verification Method including the following:i.The Verification Methods provided in the BCA.ii.Other Verification Methods, accepted by the appropriate authority that show compliance with the relevant Performance Requirement. c.Expert Judgement.d.Comparison with the Deemed-to-Satisfy Provisions. 3)Where a Performance Requirement is satisfied entirely by a Performance Solution, in order to comply with 1.thefollowingmethodmustbeusedtodeterminethePerformanceRequirementorPerformance Requirements relevant to the Performance Solution:e.Identify the relevant Performance Requirements from the Section or Part to which the Performance Solution applies. f.Identify Performance Requirements from other Sections or Parts that are relevant to any aspects of thePerformanceSolutionproposedorthatareaffectedbytheapplicationofthePerformance Solution. Page 32'